Quantcast
Channel: Solar Power World
Viewing all articles
Browse latest Browse all 4445

Top 5 points of failure on solar systems, and how to correct them

$
0
0

Third-party inspection company PV Pros details what it has seen in the field.

By Chris Grablutz, director of operations at PV Pros

A successful inspection on a solar project starts with those involved being intimate with the entire process. Each inspection task needs to be planned and delegated to the correct person. It is quite difficult to find a professional engineer or high-level electrician who has installed thousands of modules or managed miles of PV wire. It is equally difficult to find an installer that calculates point loading studies. Trying to be all things to everyone is usually what leads us at PV Pros to find deficiencies during site inspections.

technicansEven the best in the business make mistakes. February’s three-part podcast “The Effective Manager Value Chain: Fixing Deliverables” from Manager Tools made a great point that it is undoubtedly difficult to identify problems in the moment with employees, managers and more to worry about. Inspection work through a third party allows for complete attention to all the details.

Every inspection starts with a document review. The inspectors need to know the approved plans and specifications so they have a reference point for all determinations. Once the review process is complete, the lead technician can delegate tasks to team members. At PV Pros, we have our lead technician first look for workmanship and compliance with good industry practices. Start with high-level questions: Do field conditions reflect project plans? Is the site neat and orderly? Are replicable processes uniform across the site? This will quickly set the bar for what to expect deeper into the project.

Depending on the inspection request, we look for the most common problem points. Assuming plans were followed correctly, materials are at or above specification, and no eminent dangers are found, these are usually the top points of failure we find during inspection.

1. Ground faults from field-installed connectors

  • Use the correct crimping tool, per the manufacturer. Some crimping tools require calibration or limit the number of crimps per dye.
  • Ensure housing and gaskets are firmly seated around insulation. Verify that the string wire connector housing is sized properly for conductor insulation diameter.
  • Avoid securing field connectors at a local low point in a wire run as this can cause water to hug the wire and lead toward connectors.
  • Install connectors at the top or sides of module frames. Installing connectors at the bottom of the frame where water collects is unsafe.
  • Secure both sides of each connector to prevent expansion stress.

2. False or nuisance data acquisition system communication failures

  • Ensure notifications are properly set, including the threshold of upload attempts to prevent nuisance communication failure alarms.
  • Ensure all components are installed correctly, as intermittent failures can be caused by loose connections or faulty wiring.
  • Dedicate a circuit breaker to supply power to devices. It’s easy to unplug communication devices if power is supplied through a wall outlet.
  • Have a clear protocol for the building’s IT personnel. Replacing a router will cause a disruption or failure for the distributed antenna system (DAS) system.
  • On remote sites using cellular models, make sure there is a plan administrator who will remember to pay the bill!

3. Low or no open circuit string voltage

  • Verify all connectors are terminated properly. Ensure any field-installed module-to-module jumpers are installed properly.
  • Avoid wire chaffing and ground faults by practicing appropriate wire management within the racking system. Inspect for pinched wires and wire insulation exposed to metal edges.
  • Inspect module bypass diodes visually or with a thermal imaging camera.
  • Utilize a string-level tester with insulation testing capabilities. This will give you vitals like Voc, Isc, Vmax and Imax and can test insulation at 500 V to 1,000 V.

4. Low current short circuit or operating current on strings

  • Inspect for module soiling.
  • Verify all connectors are tight and making good contact. Current can pass through poor connections.

5. Inverter fault codes

  • Do not power cycle an inverter if a problem occurs. Although power cycling can solve some inverter issues, it will not correctly identify the cause.
  • Log inverter fault codes and consult the operations’ manual. Call the manufacturer’s technical support, if needed. These people can often teach you how to be better at finding and resolving field issues.

Being great at problem solving starts with 50% skill and 50% intuition. I quite often start with a hypothesis: What will I find during this experiment? I make my observations and then try to prove myself wrong. If I cannot prove myself wrong, then I have a conclusion.

Take pride in your inspections, leave no stone unturned and provide constructive feedback to make everyone better—pre- and post-installation.

Solar Power World


Viewing all articles
Browse latest Browse all 4445

Trending Articles